CNRL holds a shutdown every year, and I’ve been coming to these shutdowns for the last 6 years. This year unlike any other year we (the Foremans, and the General Foremans) were brought in for the pre-shutdown about two months before the job started, this gave us lots of time to prepare our work areas, and plan out our scope or work.

This photo Was taken on the last day before dayshift and nightshift foremans were separated.
2026 Turnaround at CNRL.


